• Raynes Park High School
    The new sixth form block provides a range of teaching and social spaces over two floors. The brief was developed in detail to suit curriculum requirements. Prefabricated construction was used to deliver cost effective high quality teaching spaces at approximately half the cost of traditional building. The on site construction period was very short offering further benefit to the school, with minimal disruption to pupil and staff use of existing buildings during term time. Various colours of blue were used externally to reflect the school colours and to present a vibrant façade.

    Client: London Borough of Merton

  • http://acanthuslw.com/wp2/wp-content/uploads/2014/03/3998-Raynes-02.jpg
  • http://acanthuslw.com/wp2/wp-content/uploads/2014/03/3998-Raynes-03.jpg
  • http://acanthuslw.com/wp2/wp-content/uploads/2014/03/3998-Raynes-04.jpg