• Crossrail Paddington Bakerloo Line Link
    Acanthus Architects LW were brought onto the project by AECOM to develop and deliver designs for the re-instructed Crossrail Bakerloo Line Link in October 2011. The original Crossrail Act scheme and earlier deep tunnel scheme were tested and value engineered leading to a revised solution developed using 3D Microstation which has achieved TWAO.

    AALW worked closely with C130 AECOM multi-disciplinary engineers, C121 Mott MacDonald SCL designers, C122 Arup/ Atkins Bored Tunnels/ Settlement/ Remediation designers, Crossrail discipline engineers and Network Rail, RMG, WCC, and LUL stakeholders to develop and deliver the designs.

    Client: Aecom for Crossrail

  • http://acanthuslw.com/wp2/wp-content/uploads/2017/09/4368-PaddingtonBakerlooLink-02.jpg
  • http://acanthuslw.com/wp2/wp-content/uploads/2017/09/4368-PaddingtonBakerlooLink-03.jpg
  • http://acanthuslw.com/wp2/wp-content/uploads/2017/09/4368-PaddingtonBakerlooLink-04.jpg